Conceptual existing-condition study of a compact bathroom with measured lines and a room sketch

Room file / Scope 01

Define What Changes and What Stays

One room record and one scope checklist make it easier to see when proposals include different work, materials or assumptions.

Concept study / planning visual
No project or contractor claim

One room record and one scope checklist make it easier to see when proposals include different work, materials or assumptions.

01 / RENOVATION CHECK

Create a measured existing-condition record

Measure the room and identify walls, openings, ceiling heights, bulkheads, fixtures, drains, supply points, outlets, switches, ventilation, heating and access panels. Photograph each elevation and note visible water damage, staining, movement, failed sealant, loose tiles and past repairs without diagnosing the cause. Record which dimensions need site verification and which areas remain concealed. Issue the same dated plan and photographs to every estimator so the comparison begins with one version of the room.

02 / RENOVATION CHECK

Define demolition and protection boundaries

List exactly what is removed, what is retained and where the work stops at adjacent rooms, corridors or common property. Include wall, ceiling and floor finishes; fixtures; cabinetry; mirrors; accessories; plumbing and electrical components; debris handling; temporary dust control; and protection of doors, elevators and travel paths. State who moves personal items and what happens if hazardous materials or hidden damage are suspected. WorkSafeBC warns that renovation can disturb asbestos-containing materials, so assessment and safe handling must occur through the responsible parties before disturbance.

03 / RENOVATION CHECK

Mark every retained and owner-supplied item

Identify fixtures, windows, doors, heating elements, accessories or finishes that remain, including their protection and reconnection. For owner-supplied products, record model, dimensions, required rough-in, delivery responsibility, inspection on arrival, storage, missing parts, warranty and delay consequences. Do not use one broad allowance when a late or incompatible item could affect walls, waterproofing or trades. The proposal should say who checks product suitability and when that decision becomes fixed.

04 / RENOVATION CHECK

Describe layout and rough-in changes

Show existing and proposed locations for the toilet, basin, tub, shower, controls, fan, lighting, outlets and heating. Separate items that remain from those that move. Ask the plumbing and electrical scopes to identify new or altered lines, connections, shutoffs, circuits, controls and inspections. The City says permits are generally needed when plumbing or electrical lines move or are installed; use the current City pages for the exact scope. Keep structural or common-system questions explicitly unresolved until reviewed.

05 / RENOVATION CHECK

State substrate and waterproofing expectations

Define how exposed walls and floors are assessed after demolition, how damaged or unsuitable material is reported and who approves repairs. Request the proposed waterproofing system, compatible components, wet-area limits, drain and fixture transitions, penetrations, sequencing and current manufacturer instructions. If an inspection, test or flood test is proposed, record its purpose, timing, conditions, acceptance authority and evidence. Avoid a generic waterproofed line that does not identify where the system begins, ends or connects to adjacent construction.

06 / RENOVATION CHECK

Schedule finishes and fixtures precisely

List tile by area, format and layout assumptions; grout and sealant; paint; cabinetry; counters; hardware; glass; plumbing fixtures; lighting; mirrors; accessories and trim. State whether quantities, waste, delivery, installation materials and taxes are included. Identify samples or mock-ups that require approval and the deadline for selections. A finish allowance should show what it covers and how a change is priced, rather than hiding product, labour or lead-time differences inside one number.

07 / RENOVATION CHECK

Include access, sequencing and cleanup

Document work hours, parking, elevator or loading reservations, key control, neighbour notices, corridor protection, water shutdown requests, waste routes and daily cleanup. Ask for a sequence that includes investigation, permits, demolition, repairs, rough-ins, inspections, substrate work, waterproofing, finishes, fixture installation and deficiencies. Note which stages depend on approval or delivery. In an occupied home or strata, a realistic access plan is part of the scope, not an informal promise made after award.

08 / RENOVATION CHECK

Define completion and closeout

Set the standard for final cleaning, fixture operation, sealant and finish review, deficiencies and correction dates. Ask for permit and inspection records, product and colour schedules, concealed-work photographs, test evidence, manuals, care instructions, warranties and approved change records. Record who receives keys, spare materials and documents. Final payment terms should match the written agreement and applicable requirements. A closeout list makes later maintenance easier and prevents important records from disappearing when the room looks finished.

Verified source boundary

These official sources provide municipal, legal or workplace-safety context for the subjects they address. They do not approve this property, determine hidden conditions or replace current property-specific review.

City of Vancouver — Renovate a Home · City of Vancouver — Plumbing Permit · City of Vancouver — Electrical Permit · WorkSafeBC — Asbestos in Renovation

Sources reviewed September 22, 2026. Confirm the current page, property facts and proposed work before making a permit, strata or construction decision.

02

Condition

Visible cracks, staining, movement, deterioration, repairs and existing finish layers.

03

Services

Known plumbing, electrical, ventilation, heat and shutoff locations without assuming concealed routes.

04

Property

Condo or house context, access, protection, working constraints and current approval questions.

02 / Scope boundaries

Separate removals, retained items and protection.

Describe demolition by object and boundary rather than using one broad allowance. Identify fixtures, finishes, millwork and assemblies to remove; items that remain; adjacent surfaces that need protection; and who handles salvage, storage or owner-supplied products. If investigation may change the scope, state the decision point and change process rather than hiding it inside a generic contingency.

ARemove

List each fixture, finish and assembly boundary, including disposal assumptions.

BRetain

Protect existing windows, trim, doors, flooring, services and adjacent rooms that stay.

CInvestigate

Identify concealed-condition questions and how findings will be documented and priced.

03 / Rough-ins + assemblies

Connect the visible room to the hidden work.

For each fixture or layout decision, list the related plumbing, drainage, venting, electrical, lighting, heating and ventilation questions. Then define the substrate and moisture-assembly evidence to request for wet areas, transitions, drains and penetrations. This checklist should route questions to appropriate qualified review and manufacturer requirements; it should not prescribe a project-specific assembly from a webpage.

Review boundary

Concealed conditions, code, permits, structure, plumbing, electrical, ventilation and assembly suitability require current project facts and the appropriate authority or qualified party.

04 / Fixtures + finishes

Distinguish selected products from allowances.

Create a finish and fixture schedule that names the decision owner, selection status, supplier, quantity, allowance where applicable, lead-time assumption, installation interface and maintenance information. Avoid comparing one proposal with fixed selections against another proposal built mainly from allowances.

Example comparison structure
CategoryDefineCompare
Tile + stoneAreas, size, pattern, edges, transitionsMaterial, setting, cuts, waste and allowance basis
FixturesModel status, finish, quantity, rough-in interfaceSupply responsibility, allowance, lead time
MillworkDimensions, storage, finish, hardware, countertopShop drawings, installation and interfaces
Glass + accessoriesExtent, hardware, support and mountingInclusions, backing assumptions and timing

05 / Commercial + closeout

Finish the scope with responsibilities and records.

Carry property protection, access, waste, approvals, owner-supplied items, site-condition procedures, changes, schedule assumptions, payment milestones and closeout into the same document. Ask what product information, operating guidance, photos, test records and other closeout material will be provided. The purpose is not to force identical methods; it is to expose what each proposal includes, excludes and assumes.

Once the room file is complete, use the same version for every proposal. Record clarifications in writing and update the comparison sheet before deciding.

Next room file / Quote comparison