Compare Bathroom Quotes on the Same Scope

Put proposals into one table. Differences in scope, allowances and exclusions often matter more than the first total at the bottom.

Commercial comparison guide
No price, schedule or availability promise

Put proposals into one table. Differences in scope, allowances and exclusions often matter more than the first total at the bottom.

01 / RENOVATION CHECK

Issue the same information to every bidder

Provide the measured room plan, photographs, desired outcomes, demolition and protection limits, fixture locations, finish level, owner-supplied items, known conditions, strata rules, approval status, access constraints and target decision date. State what is verified and what remains unknown. Invite bidders to inspect the property and list any information they still need. A common package prevents one proposal from pricing a detailed room while another prices an assumed empty shell. Ask each bidder to name who prepares the measured scope, who reviews or submits the strata package, and which outstanding approvals or selections prevent a firm construction quote. Confirm whether design or investigation is a separate engagement before accepting the proposal.

02 / RENOVATION CHECK

Build a line-by-line scope table

Create rows for project management, protection, demolition, disposal, investigation, repairs, framing, plumbing, electrical, ventilation, heating, substrates, waterproofing, tile, cabinetry, counters, glass, fixtures, paint, accessories, cleanup and closeout. Add columns for each proposal, inclusion, allowance, exclusion and clarification. Do not force unlike scopes into a false comparison; highlight the difference and ask the bidder to revise or explain it in writing.

03 / RENOVATION CHECK

Separate materials, labour and allowances

For every allowance, record the product category, amount, whether it includes tax, delivery, waste, installation materials and labour, and how overages or credits are calculated. Identify products selected by model and those still provisional. A fixture allowance may not include valves, rough-in changes, installation or repair around it. Ask when selections must be final and who checks dimensions, compatibility, lead time and condition on delivery.

04 / RENOVATION CHECK

Compare preparation and concealed work

Look for explicit demolition boundaries, substrate assessment, repair assumptions, plumbing and electrical rough-ins, ventilation path, waterproofing components, penetrations, transitions, inspections and concealed-work photographs. A quote that lists tile installation without the layers beneath it may not be comparable to one that defines the full assembly. Ask how hidden damage, hazardous materials or unsuitable conditions are reported and priced before dependent work continues.

05 / RENOVATION CHECK

Expose exclusions and owner responsibilities

Request a plain list covering permits, drawings, strata fees or deposits, professional review, hazardous-material assessment, parking, elevator booking, power, water, heating, storage, protection, fixtures, finishes, delivery, waste, final cleaning and temporary facilities. Confirm who obtains and pays for each item. An omission is not automatically included, and an owner-supplied item can still create labour, warranty or schedule responsibilities that need a written boundary.

06 / RENOVATION CHECK

Review changes and payment terms

Ask how changes are described, priced, approved and scheduled before work proceeds. Identify markup, labour rates, unit prices or allowances where relevant and require written authorization from the appropriate party. Read deposit, progress and final-payment terms together with completion definitions, deficiency handling and applicable legal requirements. Do not accept a payment schedule that is disconnected from clear milestones or records. Legal and lien questions require appropriate professional advice.

07 / RENOVATION CHECK

Compare schedule assumptions, not just dates

Break the timeline into approvals, ordering, protection, demolition, investigation, repairs, rough-ins, inspections, waterproofing, finishes, fixture installation, glass, deficiencies and closeout. Record work hours, building access, water shutdowns, lead times and owner decisions that affect each phase. Ask what happens when hidden conditions, inspection timing or a late product changes the sequence. A start or finish date without assumptions is not a reliable basis for comparison.

08 / RENOVATION CHECK

Score completeness and evidence

Review whether each proposal identifies the actual property, full scope, products or allowances, trade work, approvals, protection, quality checks, change process, schedule assumptions, exclusions, closeout and warranty conditions. Request clarification in writing and update the comparison rather than filling blanks with your own assumption. Price remains important, but the most useful decision shows what each total buys, which risks remain and who is accountable for resolving them.

Verified source boundary

These official sources provide municipal, legal or workplace-safety context for the subjects they address. They do not approve this property, determine hidden conditions or replace current property-specific review.

City of Vancouver — Renovate a Home · BC Laws — Strata Property Act · WorkSafeBC — Asbestos in Renovation

Sources reviewed September 22, 2026. Confirm the current page, property facts and proposed work before making a permit, strata or construction decision.

02

Correct

How are deficiencies recorded, scheduled and closed?

03

Document

Which product, photo, test and operating records are delivered?

04

Retain

Which decisions and documents belong in the property file?

Once the sheet is complete, compare both the total and the confidence of the scope beneath it. A proposal that clearly exposes assumptions may be easier to evaluate than one that hides them behind a single number.